The bunker alterations on hole 12 are progressing extremely
well. The sub-base and drainage works on the left-hand side greenside bunker
has now been completed. The final shaping and grading work should be finished
this week, ahead of re-tufing next week. The sub-base and drainage works have
also now been completed on the cross bunker and final grading work should
commence shortly.
 |
Shaping left-hand side green-side bunker |
 |
Green-side bunker ready for turfing |
 |
Cross bunker - Sub-base & drainage completed |
The staff have also been busy upgrading some of the paths and walkways on the course. The banking down from the 5th green to the 6th and been re-turfed and rubber safety matting installed. The buggy path between the 8th & 9th holes has also been refurbished.
 |
Resurfacing the buggy path between holes 8& 9 |