I thought I would begin with a
short up-date on the progress of the short game practice area development and
also post some pictures.
The chipping greens sub-base has
now been constructed and the greens perimeter drainage installed. The drainage
grit layer, which is a 2 mm to 6 mm diameter stone will be spread over the
sub-base early next week. This layer will stop the root-zone washing down and
blocking the perimeter drain and prevent integration of the root-zone and the
sub-base.
Next week we take delivery of the root-zone, which is
approximately 240 tonnes. With the assistance of an outside contractor this
should be spread over the chipping green by the end of the week.
Some pictures of our progress:
 |
Looking down from the 9th Tee with the green & bunkers marked out |
 |
Sub-base being delivered |
 |
Checking the levels and spreading the sub-base |
 |
Installing the perimeter drain
 |
Perimeter drain installed
Further updates to follow
|
|