Friday, 24 July 2015

Short Game Practice Area

I am delighted to inform members that the newly constructed short game practice area has opened and is now ready for limited play.

Some pictures of our progress:


July 2014 - Project commences
April 2015 - Bunker construction
July 2015 - Ready for play
August 2014
July 2015
Short game area opened for play - July 24th 2015



To allow the seeded green and its surrounds time to fully mature it has been decided that this year
the area will close in early November and re-open again next spring.

During the winter months we intend to implement further improvements in this area, details to follow.

I hope the members enjoy using the new facility just as much as we have enjoyed the constructing process and the growing in period. Well done and thanks to all..

Monday, 6 July 2015

Greens Maintenance Programme 2015

Next week, weather permitting, we intend to aerate the greens with 12mm diameter solid tines and on greens 9,10&11 with 12mm hollow tines. We also plan to apply 40 tonnes of top dressing sand to the putting surfaces once the aeration has been completed.

Twelve days ago we had a trial run on the putting green so we could measure and monitor the recovery time. After the green was aerated, sanded and brushed, an application of liquid seaweed/farmyard manure and nitrogen was applied to the green to assist and accelerate the recovery period.

Below I have included some post operation pictures

Day 1 Following aeration and sanding - soil temperature 14C
Day 4 - Ideal weather and growing conditions has advanced the recovery process 
Day 6 - Greens mowing recommences - height of cut 4.5mm

Day 10 - Height of cut 3.75mm
Day 12 - Surface levels restored

Thursday, 18 June 2015

Greens Maintenance Programme 2015


This year we are implementing a number of changes to our greens maintenance programme that our consultant agronomist Jay Dobson has recommended. 

In his last report Mr Dobson was extremely complementary about the condition of the course and was particularly impressed with the improvements to the putting surfaces. In that report it was recommended that we should increase the amount of aeration and sanding and also the timing of these operations, primarily to reduce further the amount of organic matter in the putting surfaces.

Mr Dobson felt that if we could increase the amount of disruptive aeration and double the amount of sand top dressings to 120 tonnes annually, with a target amount of 150 tonnes within three years, the additional maintenance would in time further improve putting surfaces, increase playability and ultimately give us a longer playing season.

Normally, provided ground conditions are suitable the greens are aerated every three to four weeks with a slim 8mm diameter tine. This type of aeration is not disruptive and recovery is normally only a few days. Additional they are hollow cored in the spring with a small 8mm diameter tine and again in the autumn with a 12/14 mm tine.
In the autumn they are also deep tinned with 12mm diameter solid tines to a depth of 200mm. When we use the larger 12/14mm diameter solid and hollow tines, the disruption to the putting surfaces sometimes is considerable, but it does mean we can apply large quantities of sand, which is then worked down into the aeration holes.
Normally we apply approximately 60 tonnes of top dressing sand annually.

This spring as part of our revised programme the greens were hollow cored with 12mm diameter hollow tines and deep tined with 12mm solid tines, 40 tonnes of top dressing sand was also applied.

Although the recovery period was longer than we expected mainly because of the extended cold spring/early summer weather, it was the first time in many years that this type of maintenance work had been carried out on the putting surfaces at this time of year. I am quite confident that as we apply more sand over the next few years that recovery period will be shorter and hopefully less painful.

Our next disruptive aeration and sanding operation begins week commencing July 13th and on this occasion greens 1-8 and 12-18 will be solid tinned with 12 mm diameter tines to a depth of 100mm. Greens 9,10&11 will be hollow cored with 12mm diameter tines to a depth of 75mm.


Aerating & sanding the with 12mm diameter solid tines


Brushing in sand after aeration

In conjunction with the aeration we intend to apply another 40 tonnes of top dressing sand to the putting surfaces.


Because of the enhanced soil temperatures and sunlight at this time of the year we expect recovery within 7/10 days, on greens 9,10&11 the recovery might be slightly longer because we are removing a core/plug.

I have included a short video on why golf courses aerate 








Tuesday, 14 April 2015

Two Post Turf Lift

Today engineers installed a two post turf lift in the workshop service bay. 
The two post lift will be used for assisting in maintaining and servicing our large and varied turf maintenance vehicle fleet. The arm design easily copes with either three or four wheel machines and the two post configuration provides safe access around and under the vehicle. 
The four ton load capacity lift means that any of our maintenance vehicles or tractors  including its attachment can be lifted safely.