In the last few days we have commenced drainage works on hole 10.
We are at present working on the left-hand approach to the green and are in the process of installing a 150 mm diameter perforated mains pipe, with 60 mm diameter laterals.
Some pictures of the progress:
Trench for mains pipe-work almost ready |
Excavating trenches for laterals |