Despite the recent inclement weather, we have made excellent progress on installing the new drainage pipe on the 4th fairway; the new pipe-work is now in position and the inspection chamber has been constructed.
Tomorrow, we hope to make a start back-filling the trench and making the site tidy.
I have included these two photographs that were taken earlier today;
Water now flowing into the new inspection chamber |
Drainage pipe installed and trench ready for back-filling |