Thursday 15 December 2011

Drainage 10th Hole - Update

We have now completed the small drainage project on the left-hand approach to the 10th green. The pipe-work has been installed and the drainage trenches have been backfilled with gravel and a binder layer of grit, the trenches were then topped up with fresh root-zone and are now ready for re-turfing.

Drainage trenches completed
Drainage pipework being installed

It is our intention during the next spell of frosty weather to extend these drainage works round the left-hand side of the green. This additional drainage will help considerably in removing a great deal of the standing water, which affects this area after heavy rain.

One of our goals going forward is to address areas such as at the 10th hole and tackle our drainage problems. These small projects add up and will, eventually, in time make a big difference to the condition and playability of the course. 