We have recently addressed another problem area prone to flooding on the 16th fairway.
![]() |
Flooding August 2011 |
We have installed 35 mts of 80mm diameter perforated drainage pipe.
The pipe-work has been linked into a refurbished lateral pipe, which runs across the fairway and connects into the manhole housing our new drainage outlet.
![]() |
Work in progress |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.