We have recently addressed another problem area prone to flooding on the 16th fairway.

On the left-hand side of the fairway at approximately 150/200 metres, we had a hollow that was always one of the first areas to flood and last to clear.


Flooding August 2011
We have installed 35 mts of 80mm diameter perforated drainage pipe.

The pipe-work has been linked into a refurbished lateral pipe, which runs across the fairway and connects into the manhole housing our new drainage outlet.

Work in progress




The drain track has now been backfilled, re-turfed and marked as Ground Under Repair.