Tuesday, 10 April 2012

Drainage 16th Hole - Update

16th Hole Drainage - Phase II

The next drainage project on the 16th hole will take place this winter on the low-lying area of rough between the 15th & 16th fairways.

Existing drainage pipe-work will be replaced because it has become blocked with tree roots and debris.

We will then landscape and contour the surroundings to allow excess surface water to drain quickly into the existing manhole.

The video below shows the area between the 15th & 16th fairways we intend to drain.

As a temporary measure, we lowered the existing manhole today to allow some of the surface water to drain away. This allowed us to conduct water-flow checks on other pipes on the fairway.