Friday, 30 November 2012


Drainage 16th Fairway – Update

Despite difficult ground conditions and inclement weather we have made good progress on the 1st phase of drainage works on the 16th fairway.  

We have repaired a number of collapsed drains and installed an additional fifty meters of new drainage pipe-work. 

Some of the fairway areas, which were damaged by the prolonged wet weather this summer, have also been repaired.
Repairs almost completed

Due to a ground frost this morning we were able to aerate the area to a depth of 200mm with 19mm diameter tines, which will aid recovery. 



Video - Aeration 16th Fairway

No comments:

Post a Comment

Note: only a member of this blog may post a comment.