Despite
difficult ground conditions and inclement weather we have made good progress
on the 1st phase of
drainage works on the 16th fairway.
We
have repaired a number of collapsed drains and installed an additional fifty
meters of new drainage pipe-work.
Repairs almost completed |
Due to a ground frost this morning we were able to aerate the area to a depth of 200mm with 19mm diameter tines, which will aid recovery.