Over the last few days we have
begun the installation of a new phone line cable into the Greenkeeping
Facilities.
The new cable will connect into
the underground junction box beside the 18th tee gate and cross the
17th fairway before its installation into the facility.
This new cable, when installed
and connected, will replace the temporary supply from our old facilities.
Unfortunately, the old supply cable is prone to water ingression in a number of different areas and is
now beyond economical repair.
Some pictures of our progress.
Excavating across the 17th fairway |
Half way point |
Backfilling the trench and relaying the turf |