We are at present installing three sets of raised kerbs on the lower section of the pathway from the 10th tees.
These are being installed to divert surface water away from the pathway and to help prevent washout of the path surface.
Second kerb installed |
Final kerb section being cemented into place |
Once the cement work has set, this section of pathway will be dressed with a mixture of granite dust and cement before finally being rolled and compacted.