Four
years ago we replaced a section of the main drainage pipe down the left-hand
side of the 4th fairway
that had become damaged by tree roots. The tree roots were restricting the flow
of water and causing flooding to the main fairway landing area.
Recently
we have been experiencing extensive flooding in front of the 4th green and after further investigations
we found that tree roots have now damaged and blocked a large section of
drainage pipe alongside and behind the 4th green.
To help alleviate this flooding we have decided to replace this damaged section
of pipe-work with a new 160 mm diameter solid pipe.
 |
Line of new solid drainage pipe |
 |
Excavating new drainage track |
 |
Existing pipe damaged by roots |
 |
Close up of damaged pipe |
 |
Existing 160 mm perforated pipe almost completely blocked by tree roots |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.