Despite some challenging conditions good progress has been made on the drainage project on the 4th hole.

We have installed 80mts of 160 mm diameter solid drainage pipe and begun backfilling the trench, weather permitting we should finish this section early next week.


While we have the main drainage trench open we intend to install another drain from in front of the 4th green and connect this into the new pipe-work.  